Business-as-usual (BAU)
BAU (Business-as-usual): Business-as-usual pathway. Historical market shares use observed sales through 2025; projections start in 2026.
Trade barrier scenarios
NTB (No Trade Barrier): LFP battery import tariff: 3.4%. Base tariff only. Logistics cost: $2.7/kWh.
MTB (Moderate Trade Barrier): LFP battery import tariff: 28.4%. Includes the 3.4% base tariff and 25% Section 301 tariff. Logistics cost: $2.7/kWh.
ETB (Elevated Trade Barrier): LFP battery import tariff: 38.4%. Adds a temporary 10% import surcharge under Section 122 to MTB. Logistics cost: $2.7/kWh.
HTB (High Trade Barrier): LFP battery import tariff: 63.4%. Adds a 25% stress tariff to ETB as a counterfactual high-barrier case. Logistics cost: $2.7/kWh.
Proposed CAFE adjustment scenarios
CAFE-FE (Fuel economy adjustment): Applies only the fuel economy trajectories in the proposed CAFE adjustment.
CAFE-PC (Additional purchase cost adjustment): Additional ICEV purchase cost reductions are $0 in 2025–2026, then $284, $630, $820, $896 and $925 in 2027–2031. HEV reductions are half of ICEV values. The 2031 reductions remain thereafter.
CAFE (Combined proposed CAFE adjustment): Combines the fuel economy trajectories in CAFE-FE and the additional purchase cost adjustments in CAFE-PC.
Single-factor uncertainty scenarios
HGP (High Gasoline Prices): Single-factor uncertainty: High Gasoline Prices. All other factors retain their BAU settings.
LGP (Low Gasoline Prices): Single-factor uncertainty: Low Gasoline Prices. All other factors retain their BAU settings.
HEP (High Electricity Prices): Single-factor uncertainty: High Electricity Prices. All other factors retain their BAU settings.
LEP (Low Electricity Prices): Single-factor uncertainty: Low Electricity Prices. All other factors retain their BAU settings.
HHC (High Home-charging Access): Single-factor uncertainty: High Home-charging Access. All other factors retain their BAU settings.
LHC (Low Home-charging Access): Single-factor uncertainty: Low Home-charging Access. All other factors retain their BAU settings.
HFC (High Public Fast-charging Share): Single-factor uncertainty: High Public Fast-charging Share. All other factors retain their BAU settings.
LFC (Low Public Fast-charging Share): Single-factor uncertainty: Low Public Fast-charging Share. All other factors retain their BAU settings.
HAD (High Annual Vehicle Miles Traveled): Single-factor uncertainty: High Annual Vehicle Miles Traveled. All other factors retain their BAU settings.
LAD (Low Annual Vehicle Miles Traveled): Single-factor uncertainty: Low Annual Vehicle Miles Traveled. All other factors retain their BAU settings.
LVP (Long Vehicle-use Period): Single-factor uncertainty: Long Vehicle-use Period. All other factors retain their BAU settings.
SVP (Short Vehicle-use Period): Single-factor uncertainty: Short Vehicle-use Period. All other factors retain their BAU settings.
HDR (High Discount Rate): Single-factor uncertainty: High Discount Rate. All other factors retain their BAU settings.
LDR (Low Discount Rate): Single-factor uncertainty: Low Discount Rate. All other factors retain their BAU settings.
HVT (High Value of Time): Single-factor uncertainty: High Value of Time. All other factors retain their BAU settings.
LVT (Low Value of Time): Single-factor uncertainty: Low Value of Time. All other factors retain their BAU settings.